2012 UFO List – status 12/27/2012
1) Sew together 2nd Diamond Patch Quilt -
get quilted and then bind - Done 5/1/2012
2) Get 1st Diamond Patch Quilt quilted and bound (making these for the beds in
our newly decorated guest room- our son's old room) - Done 5/8/2012
3) Bind Four-Patch Heart Quilt – Done 2/18/2012
4) Layer, Tie and Bind Scrappy Patch Quilt – Done 4/19/2012
4A) Sew Together and Complete Emma's Star Quilt – Done 8/25/2012
5) Layer, Tie and Bind Pink Jelly Roll Quilt – Done 1/29/2012
6) Layer, Tie and Bind Blue Jelly Roll Quilt - Done 2/6/2012
7) Layer, Tie and Bind Nine-Patch Baby Quilt – Done 8/11/2012
8) Layer, Tie and Bind Becky's Design Baby Quilt – Done 3/6/2012
9) Cut out, Sew and Complete Weave it to Me Quilt – Partially cut-out
10) Cut out, Sew and Complete Criss-Cross Applesauce Quilt – Top done 8/5/2012
11) Cut out, Sew and Complete Polka Dots, Prints and Pinwheels Quilt –
Partially assembled
12) Cut out, Sew and Complete Striking scrappy Quilt – Top done 10/2/2012 at
Longarm Quilter
Other
Quilt Projects :
Three Christmas Tumbler Quilts – Done 10/30/2012
Baby Quilt for Brianna and Andrew – Done 6/15/2012
Hearstrings Quilt with 24 squares – Done 5/14/2012
Quilt for Elyse & Aaron Cleveland Wedding – Done 6/3/2012
Quilt for Sara – Done 5/3/2012
Baby Quilt for Melissa & Ed – Done 6/27/2012
Baby Quilt with Teddy Bears – Top done Sept, 2012
National Park Wall Quilts (Glacier, Zion, Bryce and Rocky Mountain) – tops done, need quilting
Santa Blocks Christmas Quilt – Done 12/22/2012
Cross
Stitch Projects during 2012:
Swedish
Patterned Runner for Dee – Done 10/27/2012
Cross
Stitch Ornaments for Reeve and Anderson family (8 count) – Done 7/30/2012
When I look at this I guess that I did get a lot done during 2012!!!
Hope that I can do as much in 2013.
Very, very impressive. But then, you have always excelled. I'm proud of you and jealous of you all at the same time. 2013 should be a great quilting year - hopefully for us both.
ReplyDelete